These beautiful, high-quality apartments in a residential area in the heart of Givisiez offer an idyllic living environment.
An exceptional situation, quiet, close to nature and all amenities, shops, road access, primary school 850 meters away and public transport 550 meters on foot.
These bright and comfortable through apartments offer an open kitchen, a spacious living room with access to a generous terrace and a beautifully landscaped garden facing southwest, perfect for enjoying the sunrise and sunset.
On the second floor there are two spacious children’s bedrooms with bathrooms, as well as a master bedroom with an en-suite bathroom and dressing area.
This 6-unit contemporary building is equipped with individual cellars and a covered parking space per apartment. Photovoltaic panels, a visitor parking space, and a bicycle parking area for all the apartments complete this exceptional property.
Composition 4,5 pcs in DuplexGround floor- Living room Kitchen Hall 41.54 m2
- Visitor WC 4.53 m2
floor- 2 Children’s rooms 11 m2
- 1 Master bedroom + dressing room 17.95 m2
- 1 private bathroom for the master bedroom 4.52 m2
- 1 bathroom with bathtub 4.97 m2
Basement- 1 Private cellar 2.56 m2
- 1 Technical room 11.42 m2
Details of available lots;Lot 13-1. 4,5 Duplex
112.18 m2 with terrace 16.94 m2, garden 16.31 m2, cellar 2.56 m2, weighted area 118.03m2: Reserved
Lot 13-2. 4,5 Duplex 110.56 m2 with terrace 17.16 m2, garden 18.15 m2, cellar 2.52 m2, weighted area 116.47 m2:
SOLD Lot 13-3. 4,5 Duplex
110.56
m2 with terrace 17.16 m2, garden 21.38 m2, cellar 2.56 m2, weighted area 116.48 m2: Reserved
Lot 13-4.5, 5.5 Duplex
116.70 m2 with terrace 19.32 m2, garden 101.57 m2, cellar 2.49 m2 weighted area 123.32 m2: SOLD
Lot 13-5. 2,5 Attic 52.28 m2 with terrace of 59 m2, cellar 2.52 m2, weighted area 72.00 m2: 585,000 CHF
Lot 13-6. 2,5 Attic 52.17 m2 with terrace of 44.11 m2, cellar 2.56 m2,
weighted area 66.98 m2: 575,000 CHF
Covered parking space extra: 25,000 CHF
The choice of materials is at the lessee’s discretion.
Construction start summer 2026.
The project is expected to be completed by the fall of 2027.
Please contact us for more information.